Projects 2019 – Twelve Mile Lake (Phase 1)

Our largest shoreline stabilization project to date!

This once neglected site has now started the process to undergo a huge transformation. A natural erosion protection system has now been put in place to stabilize the steep sandy slope. An assortment of random sized boulders and river rock underlain with geotextile cloth is not only functional, it is also beautiful. Mulch was added to help with stabilization and cover areas that have been prepped for future patios and walkways. Multiple granite staircases were installed to provide safe and easy access to the water. A granite block retaining wall will support a beautiful flagstone patio for our clients to enjoy lake living. Can’t wait to start phase 2!

Comments are closed.